• info@1st-coeng.com
  • Je suis sur Facebook.
  • LinkedIn
  • Youtube
  • Pour Instagram
  • Retour au sommet
Qualité ligne de production de batteries au lithium usine
ligne de production de batteries au lithium
Qualité COENG Semi Automatic Energy Storage Battery PACK Production Line 02 usine
Qualité COENG Semi Automatic Energy Storage Battery PACK Production Line 02 usine
Qualité COENG Semi Automatic Energy Storage Battery PACK Production Line 02 usine
Qualité COENG Semi Automatic Energy Storage Battery PACK Production Line 02 usine
Qualité COENG Semi Automatic Energy Storage Battery PACK Production Line 02 usine

COENG Semi Automatic Energy Storage Battery PACK Production Line 02

COENG Semi Automatic Energy Storage Battery PACK Production Line 02

Attributs clés

Nom de la marque: COENG
Numéro de modèle: paquet de batterie de stockage d'énergie
Lieu d'origine: Chine
Attestation: CE
Quantité minimum de commande: 10
Conditions de paiement: LC, D/A, D/P, T/T
Attributs du produit
Mettre en évidence

Semi Automatic Battery Pack Line

,

Lithium Battery Pack Production Line

,

Energy Storage Battery PACK Assembly

Exigence de l'opérateur:
Techniciens qualifiés avec formation de base
Longueur de la ligne de production:
Généralement 10 à 30 mètres
VoltageRange:
3,7 V à 48 V
Installation et formation:
Fournit par le fabricant
Méthode de soudage:
Soudage laser, soudage par ultrasons, soudage par points
Plage de tension de sortie:
Batteries de 3,7 V à 48 V
Caractéristiques de sécurité:
Protection contre les surintensités, arrêt d'urgence, suppression d'incendie
Équipement de test:
Testeur de tension, testeur de capacité, testeur de résistance interne
Système de contrôle:
Contrôle PLC avec interface à écran tactile
Alimentation:
C.A. 220 V/380 V, 50/60 Hz
Puissance de sortie nominale:
500 kW
Capacité de la batterie:
552 kWh
Types de batteries pris en charge:
Lithium-ion, lithium polymère, LiFePO4
Nom du produit:
ligne de production de batteries au lithium
Capacité de production:
Personnalisable, généralement 1 000 à 50 000 packs par jour
Description du produit
Semi Automatic Energy Storage Battery PACK Production Line Overview COENG Semi Automatic Energy Storage PACK Production Line 02 combines module assembly and PACK integration for square aluminum-shell cells. This lithium battery pack production line pairs dedicated equipment with defined manual workstations, supporting a project-specific approach to energy storage battery assembly. Module Assembly Process The module process includes mechanical-arm feeding, OCV sorting and code
Note globale
5.0
★★★★★
★★★★★
Basé sur 50 critiques récemment
cinq étoiles
100%
4 étoiles
0
3 étoiles
0
2 étoiles
0
1 étoile
0
Tous les avis
  • R
    Rafael Costa
    Brazil Sep 16.2026
    ★★★★★
    ★★★★★
    We chose the COENG glove box for a battery materials development workspace requiring controlled-atmosphere handling and frequent transfers of small samples and laboratory tools. The large antechamber with its sliding tray, together with a separate small antechamber, was particularly relevant to our workflow. Penny worked through our material list, solvent use and utility requirements with us. We also discussed the regeneration function and the solvent adsorption module with its 7 kg activated carbon charge. Her explanation of the configuration and the items requiring technical confirmation helped us prepare a clearer installation and acceptance plan.
  • M
    Michael van Dijk
    Austria Sep 5.2026
    ★★★★★
    ★★★★★
    What we appreciate most about the COENG EnerCube 3.0 is its integrated design. Having the batteries, PCS and supporting systems in one container made it easier for our team to review the equipment scope and plan the installation. The model comparison also helped us discuss power and capacity requirements more clearly
  • J
    James Wilson
    France Aug 31.2026
    ★★★★★
    ★★★★★
    The procurement discussions covered more than the battery specifications. Container dimensions, delivery access, unloading responsibilities and commissioning requirements were all important to our project planning. We valued having these points clearly defined before arranging shipment.
Demandez un devis
Veuillez remplir le formulaire ci-dessous et nous vous répondrons dans les plus brefs délais.