COENG Semi Automatic Energy Storage Battery PACK Production Line 02
Key Attributes
Semi Automatic Battery Pack Line
,Lithium Battery Pack Production Line
,Energy Storage Battery PACK Assembly
COENG Semi Automatic Energy Storage PACK Production Line 02 combines module assembly and PACK integration for square aluminum-shell cells. This lithium battery pack production line pairs dedicated equipment with defined manual workstations, supporting a project-specific approach to energy storage battery assembly.
The module process includes mechanical-arm feeding, OCV sorting and code scanning, manual adhesive and EVA placement, cell compression and terminal preparation. Manual CCS installation, battery module laser welding, residue cleaning and weld inspection are followed by electrical checks and data acquisition.
The PACK section covers liquid cooling plate dust removal, automatic adhesive dispensing and module placement in the housing. BMS, busbar and low-voltage harness assembly lead into upper-cover installation, EOL testing, airtightness testing and assisted unloading. Test coverage is defined for the selected PACK design.
| Reference Equipment Envelope | Approximately 45 × 3.5 × 2.2 m |
|---|---|
| Configuration Variables | Final tooling, station configuration and access space depend on cell dimensions, module arrangement and factory layout |
| Automation Scope | Semi automatic line with defined manual workstations and dedicated equipment |
This semi automatic battery pack assembly line gives buyers a clear basis for discussing the automation scope and required manual operations.
Looking for a battery pack production line supplier or a quotation for a lithium battery pack OEM production line? Send COENG your cell drawings, PACK design, output target and factory plan. Discuss battery pack production line cost against the required equipment, inspection scope and project acceptance criteria.
-
RWe chose the COENG glove box for a battery materials development workspace requiring controlled-atmosphere handling and frequent transfers of small samples and laboratory tools. The large antechamber with its sliding tray, together with a separate small antechamber, was particularly relevant to our workflow. Penny worked through our material list, solvent use and utility requirements with us. We also discussed the regeneration function and the solvent adsorption module with its 7 kg activated carbon charge. Her explanation of the configuration and the items requiring technical confirmation helped us prepare a clearer installation and acceptance plan.
-
MWhat we appreciate most about the COENG EnerCube 3.0 is its integrated design. Having the batteries, PCS and supporting systems in one container made it easier for our team to review the equipment scope and plan the installation. The model comparison also helped us discuss power and capacity requirements more clearly
-
JThe procurement discussions covered more than the battery specifications. Container dimensions, delivery access, unloading responsibilities and commissioning requirements were all important to our project planning. We valued having these points clearly defined before arranging shipment.